top of page


Before

After
This property needed a complete exterior renovation. Major grading was done to prevent water from getting in the basement. Both entryways were improved with the front getting a new roof and the side getting a new metal door and brick landing/retaining wall. The entire outside was painted (12 gallons)





new concrete curb








bottom of page